
PennDOT has announced a resurfacing project for Interstate 80 in Clarion and Jefferson Counties is starting May 5. This project also includes bridge work on Interstate 79 in Butler County and Interstate 80 in Clarion and Jefferson Counties.
The I80 project consists of a culvert replacement and a highway resurfacing project along I80 as well as other miscellaneous construction. This includes the area of I80 beginning less than half a mile west of the Clarion/Venango County Line to about 11 miles east of the Jefferson/Clarion County Line.
The impacted areas include Monroe/Clarion/Limestone/Paint/Beaver and Richland Townships in Clarion County and Union/Rose and Pine Creek Townships in Jefferson County.
The speed limit will be reduced to 60 miles per hour throughout the construction zone.
A 12-foot lane restriction from mile marker 45 to mile marker 73 in both the eastbound and westbound lanes of Interstate 80 will be enforced.
Also included with this project are the following Interstate 79 and Interstate 80 bridge epoxy overlays: Bridges on Interstate 79 over T-969 and State Route 68 in Butler County, Cranberry and Jackson Townships. Bridges on Interstate 80 bridges over Deer Creek/T-411, T-310 and State Route 4003 in Jefferson County and Brookville Borough.
Drivers can check conditions at 511pa.com or through the 511pa mobile app.
Comments