
PennDOT announced Monday that the Smicksburg Bridge (Goodville Road) project will resume on April 7 and continue through April 30.
PennDOT says deterioration was discovered during the earlier phase of the work and that changed the scope of the project from rehabilitation to replacement. Construction included State route 4022 Dayton-Smicksburg Road, behind Country Junction, and the T-392 Loop Road.
To detour, drivers should use Route 954, Township Road 396, also known as Windows Road and Township Road 377, also known as Hoover Road. Motorists can check conditions at 511pa.com or through the 511PA mobile app.
Comments